WorldCat Identities

Willmott, Peter

Overview
Works: 4 works in 5 publications in 2 languages and 1,266 library holdings
Genres: Juvenile works 
Roles: Author
Classifications: QK49, 582.13
Publication Timeline
.
Most widely held works by Peter Willmott
Flowers by Terry J Jennings( Book )

1 edition published in 1989 in English and held by 157 WorldCat member libraries worldwide

An introduction to the basic characteristics of plants and flowers. Includes instruction for a variety of simple experiments
Le village dans la ville famille et parenté dans l'est londonien by Michael Dunlop Young( Book )

1 edition published in 2010 in French and held by 41 WorldCat member libraries worldwide

The face of Britain : a policy for town and country planning by Peter Geoffrey Hall( Book )

2 editions published in 1961 in English and held by 2 WorldCat member libraries worldwide

TPM : a route to world-class performance by Peter Willmott( )

1 edition published in 2001 in English and held by 0 WorldCat member libraries worldwide

Total productive maintenance (TPM), a Japanese management protocol developed to alleviate production losses caused by machine breakdowns has moved on. Through TPM, more companies accept the concept of Zero Breakdowns as achievable. From the foundation of zero breakdowns, world class plants are able to run for complete shifts without the need for intervention. TPM is still pushing back the boundaries of what was thought possible. Driven by the proven principles of TPM, the book emphasises the need to build on existing good practices and to win commitment by delivering results. The book provides a practical guide to delivering TPM benefits and is based on the authors' first hand experience of seeing TPM in Japan. It adapts these benefits to suit the strategic needs of companies across four continents. "TPM A Route to World Class Performance" builds on Peter Willmott's earlier book, "TPM the Western Way", updating the scope of applications and tools. The TPM route map is updated to include the journey to zero breakdowns and beyond. It also provides a systematic structure to evolve from the classic Total Productive Maintenance towards Total Productive Manufacturing and deliver a Totally Productive Operation capable of world leading performance
 
Audience Level
0
Audience Level
1
  Kids General Special  
Audience level: 0.45 (from 0.04 for TPM : a ro ... to 0.90 for Le village ...)

Languages