WorldCat Identities

Repair, Evaluation, Maintenance, and Rehabilitation Research Program

Overview
Works: 255 works in 502 publications in 1 language and 4,100 library holdings
Genres: Case studies 
Roles: Originator
Publication Timeline
.
Most widely held works about Evaluation, Maintenance, and Rehabilitation Research Program Repair
 
Most widely held works by Evaluation, Maintenance, and Rehabilitation Research Program Repair
Floating debris control : a literature review by Roscoe E Perham( Book )

5 editions published in 1987 in English and held by 116 WorldCat member libraries worldwide

Latex admixtures for Portland cement concrete and mortar by Dennis L Bean( Book )

5 editions published in 1986 in English and held by 94 WorldCat member libraries worldwide

Stability of rubble-mound breakwater and jetty toes : survey of field experience by Dennis G Markle( Book )

3 editions published in 1986 in English and held by 68 WorldCat member libraries worldwide

Geotechnical aspects of rock erosion in emergency spillway channels by Christopher C Mathewson( Book )

8 editions published between 1986 and 1998 in English and held by 64 WorldCat member libraries worldwide

This study addresses the geologic factors that control rock erosion in emergency spillway channels, develops a technique to evaluate the risk and predict the potential erosion of rock and soil exposed to hydraulic attack during a flow event in the channel, and provides design concepts for the repair and rehabilitation of spillway erosion
Field evaluation of Port Everglades, Florida, rehabilitation of south jetty by void sealing by Julie Dean Rosati( Book )

3 editions published in 1990 in English and held by 55 WorldCat member libraries worldwide

This report presents results of a monitoring program designed to evaluate the effectiveness of a prototype void and sand-sealing operation. The Port Everglades south jetty is a rubble stone structure with large 'man sized' voids. Beach Fills place south of the structure eroded at an extremely high rate, indicating that material was being lost through the structure into the entrance channel, where it was thought to be a contributing factor to navigation channel shoaling. Sealing of the structure with sodium silicate-cement for filling void cavities and with sodium silicate-diacetin for stabilizing sand- filled voids within the structure formed a barrier to sediment infiltration. Four site visits were performed as part of the monitoring program: (a) reconnaissance trip, (b) preconstruction experiment, (c) during construction inspection and observation, and (d) postconstruction experiment. The transmission of dye and current meters in structure voids indicated net flow through the structure before and after construction sealing. The tests indicated that the structure was less transmissible in the postconstruction condition. Keywords: Rock/gravel/structures; Earth fills; Sediment transport; Breakwaters/ permeability; Grout; Channel/waterways; Channel dredging
Case histories of Corps breakwater and jetty structures by Donald L Ward( Book )

2 editions published in 1988 in English and held by 55 WorldCat member libraries worldwide

Stability of dolos and tribar overlays for rehabilitation of stone-armored rubble-mound breakwater and jetty trunks subjected to breaking waves by Robert D Carver( Book )

5 editions published in 1988 in English and held by 55 WorldCat member libraries worldwide

Case histories of Corps breakwater and jetty structures : by Francis E Sargent( Book )

3 editions published in 1989 in English and held by 54 WorldCat member libraries worldwide

Underwater inspection of coastal structures using commercially available sonars by William M Kucharski( Book )

2 editions published in 1990 in English and held by 54 WorldCat member libraries worldwide

Case histories of Corps breakwater and jetty structures by Ernest R Smith( Book )

2 editions published in 1988 in English and held by 54 WorldCat member libraries worldwide

Case histories of Corps breakwater and jetty structures by Francis E Sargent( Book )

2 editions published in 1988 in English and held by 53 WorldCat member libraries worldwide

Methods to reduce wave runup and overtopping of existing structures by John P Ahrens( Book )

3 editions published between 1988 and 1990 in English and held by 53 WorldCat member libraries worldwide

Repair of localized armor stone damage on rubble-mound structures : coastal model investigation by Donald L Ward( Book )

4 editions published in 1990 in English and held by 53 WorldCat member libraries worldwide

Case histories of Corps breakwater and jetty structures by Francis E Sargent( Book )

2 editions published in 1988 in English and held by 53 WorldCat member libraries worldwide

Prototype experience with the use of dissimilar armor for repair and rehabilitation of rubble-mound coastal structures by Robert D Carver( Book )

3 editions published in 1989 in English and held by 52 WorldCat member libraries worldwide

Rehabilitation of permeable breakwaters and jetties by void sealing : summary report( Book )

4 editions published in 1990 in English and held by 52 WorldCat member libraries worldwide

Many breakwaters and jetties have become permeable to sand transport and wave transmission, a condition that results in increased operations and maintenance dredging costs and increased risks and delays to navigation. First-cost savings could be realized by applying grouting techniques and sealing procedures developed for closing voids and fractures, instead of the more expensive method of applying layers of chinking and armor stone to the existing structure. The longevity of such grouts and sealants placed in voids of rubble-mound structures exposed to wave and current conditions is not well known. The term 'sealant' is used here to describe any material that closes voids and include grouts and very stiff, aggregate-containing cementitious and asphalt materials. This problem was separated into two parts; an evaluation of the effectiveness of materials already being used the development of guidance on sealant hole drilling, quantities to inject, techniques of injection, and knowledge of material properties to effectively create the barrier
Case histories of Corps breakwater and jetty structures by Francis E Sargent( Book )

3 editions published in 1989 in English and held by 52 WorldCat member libraries worldwide

Stability of dolos overlays for rehabilitation of tribar-armored rubble-mound breakwater and jetty trunks subjected to breaking waves by Robert D Carver( Book )

3 editions published in 1988 in English and held by 52 WorldCat member libraries worldwide

Stability of dolos overlays for rehabilitation of dolos-armored rubble-mound breakwater and jetty trunks subjected to breaking waves by Robert D Carver( Book )

3 editions published in 1988 in English and held by 52 WorldCat member libraries worldwide

Case histories of Corps breakwater and jetty structures by Robert R Bottin( Book )

2 editions published in 1988 in English and held by 51 WorldCat member libraries worldwide

 
moreShow More Titles
fewerShow Fewer Titles
Audience Level
0
Audience Level
1
  Kids General Special  
Audience level: 0.69 (from 0.63 for Floating d ... to 0.79 for Geotechnic ...)

Alternative Names
REMR

REMR (Repair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.))

REMR Research Program

United States. Army. Corps of Engineers. Repair, Evaluation, Maintenance, and Rehabilitation Research Program

United States. Repair, Evaluation, Maintenance, and Rehabilitation Research Program

Languages
English (69)