WorldCat Identities

De Reyck, Bert

Overview
Works: 32 works in 44 publications in 1 language and 82 library holdings
Roles: Author, Other, Contributor
Publication Timeline
.
Most widely held works by Bert De Reyck
Scheduling projects with generalized precedence relations : exact and heuristic procedures by Bert De Reyck( Book )

5 editions published in 1998 in English and held by 8 WorldCat member libraries worldwide

Phase transitions in project scheduling by Willy Herroelen( Book )

2 editions published between 1998 and 1999 in English and held by 5 WorldCat member libraries worldwide

Assembly line balancing by resource-constrained project scheduling techniques : a critical appraisal by Bert De Reyck( Book )

1 edition published in 1995 in English and held by 4 WorldCat member libraries worldwide

On the use of the restrictiveness as a measure of complexity for resource-constrained project scheduling by Bert De Reyck( Book )

1 edition published in 1995 in English and held by 3 WorldCat member libraries worldwide

A classification scheme for project scheduling problems by Willy Herroelen( Book )

1 edition published in 1997 in English and held by 3 WorldCat member libraries worldwide

On the paper "Resource-constrained project scheduling : notation, classification, models and methods" by Brucker et al. by Willy Herroelen( Book )

2 editions published in 1999 in English and held by 3 WorldCat member libraries worldwide

The multi-mode resource-constrained project scheduling problem with generalized precedence relations by Bert De Reyck( Book )

1 edition published in 1997 in English and held by 3 WorldCat member libraries worldwide

An integrated classification scheme for resource scheduling by Willy Herroelen( Book )

2 editions published in 1999 in English and held by 3 WorldCat member libraries worldwide

An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations by Bert de Reyck( Book )

1 edition published in 1996 in English and held by 3 WorldCat member libraries worldwide

A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precendence relations by Bert De Reyck( Book )

1 edition published in 1996 in English and held by 3 WorldCat member libraries worldwide

The discrete time/resource trade-off problem in project networks : a branch-and-bound approach by Erik L Demeulemeester( Book )

1 edition published in 1997 in English and held by 3 WorldCat member libraries worldwide

An optimal procedure for the unconstrained max-npv project scheduling problem with generalized precedence relations by Bert de Reyck( Book )

1 edition published in 1996 in English and held by 3 WorldCat member libraries worldwide

Algorithms for scheduling projects with generalized precedence relations by Bert de Reyck( Book )

1 edition published in 1998 in English and held by 3 WorldCat member libraries worldwide

On the use of the complexity index as a measure of complexity in activity networks by Bert De Reyck( Book )

1 edition published in 1993 in English and held by 3 WorldCat member libraries worldwide

Resource-constrained project scheduling : a survey of recent developments by Willy Herroelen( Book )

1 edition published in 1996 in English and held by 3 WorldCat member libraries worldwide

Project scheduling under generalized precedence relations : a review by Bert De Reyck( Book )

1 edition published in 1995 in English and held by 3 WorldCat member libraries worldwide

Computational experience with a branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precendence relations by Bert De Reyck( Book )

1 edition published in 1996 in English and held by 3 WorldCat member libraries worldwide

A hybrid scatter search: electromagnetism meta-heuristic for project scheduling by Dieter Debels( Book )

2 editions published in 2003 in English and held by 2 WorldCat member libraries worldwide

Project Planning with Alternative Technologies in Uncertain Environments by Stefan Creemers( )

2 editions published between 2013 and 2014 in English and held by 2 WorldCat member libraries worldwide

We investigate project scheduling with stochastic activity durations to maximize the expected net present value. Individual activities also carry a risk of failure, which can cause the overall project to fail. To mitigate the risk that an activity's failure jeopardizes the entire project, more than one alternative may exist for reaching the project's objectives, and these alternatives can be implemented either in parallel or in sequence. In the project planning literature, such technological uncertainty is typically ignored and project plans are developed only for scenarios in which the project succeeds. We propose a model that incorporates both the risk of activity failure and the possible pursuit of alternative technologies. We find optimal solutions to the scheduling problem by means of stochastic dynamic programming. Our algorithms prescribe which alternatives need to be explored, and whether they should be investigated in parallel or in sequence. We also examine the impact of the variability of the activity durations on the project's value
Strategic information technology and portfolio management( Book )

1 edition published in 2015 in English and held by 2 WorldCat member libraries worldwide

 
moreShow More Titles
fewerShow Fewer Titles
Audience Level
0
Audience Level
1
  General Special  
Audience level: 0.00 (from 0.00 for Scheduling ... to 0.00 for Scheduling ...)

Strategic information technology and portfolio management
Covers
Alternative Names
Bert De Reyck 1971-: Faculteit: Economie en Bedrijfskunde Discipline: Economie, Bedrijfseconomie en Management, Wiskunde, Toegepaste Wiskunde en Informatica

De Reyck, B.

DeReyck, B.

DeReyck, Bert

Reyck, B. de

Reyck, Bert de

Languages
English (29)